  • Find permits: After logging in, select “My Work” from the menu and then “My Permits”. If you don’t find the permit, then the email under which you are logged in is not associated with that permit. Try another email or call us for assistance.

  • Apply for Permits: Select “Apply” from the menu and use the application assistant to search using keywords. For instance: “roof”, “plumbing” or “driveway”, etc.

  • Apply for Sub Permits: From the master permit, sub permits can be applied from the sub-records tab. If you don’t have access to the master permit, go to the “Apply” page and search using keywords. Ensure the master permit number is readily available.

  • Change of Contractor: Go to the “Apply” page and search for change of contractor.

  • NOC: Upload NOC directly to the permit attachment tab. Don’t forget to click the submit button on the bottom right.

  • Notice to Building Official of Use of Private Provider: go to the permit sub-records tab and apply.
    Download Notice to Building Official of Use of Private Provider

  • Private Provider Inspection Report: go to the permit sub-records tab and apply.

  • Design Professional Letter for Inspection or Clarification: go to the permit sub-records tab and apply.

  • Roof Uplift Test: go to the permit inspections tab and request “Roof Uplift Test - BLD-PR”. Once requested, use the back button to find and open the inspection and upload the document. Click here to watch the inspection video

  • Roof Re-nailing Affidavit: go to the permit inspections tab and request “Roof Re-Nailing Affidavit - BLD-PR”. Once requested, use the back button to find and open the inspection and upload the document. Click here to watch the inspection video

  • Electrical Release Agreement (Temp for Test): go to the permit inspections tab and request “Temp for Test - ELEC-PR”. Once requested, use the back button to find and open the inspection and upload the document. Click here to watch the inspection video
    Download Electrical Release Agreement – (TEMP FOR TEST)

  • Permit Cancellation: go to the permit sub-records tab and apply.
    Download Request to Cancel Application or Permit

  • Foundation Holds: go to the permit inspections tab and request appropriate PR inspections. Note that system enforces a priority order where incomplete “PR” inspections will prevent the next field inspections from being requested. Click here to watch the inspection video
  • Monolithic:
    • Form Board Survey - BLD-PR
    • Soil Density Report - BLD-PR
    • Termite Treatment Report - BLD-PR
    • Slab – BLD
    • Under Construction Elevation Certificate - BLD-PR
  •  Stem Wall: 
    • Soil Density Report - BLD-PR
    • Termite Treatment Report - BLD-PR
    • Foundation/Footing – BLD
  • Stem Wall Slab:
    • Soil Density Report - BLD-PR
    • Stem Wall Survey - BLD-PR
    • Termite Treatment Report - BLD-PR
    • Slab – BLD
    • Under Construction Elevation Certificate - BLD-PR
  • Pile:
    • Engineer's Pile Log - BLD-PR
    • Form Board Survey - BLD-PR
    • Termite Treatment Report - BLD-PR
    • Grade Beam Only – BLD
    • Slab – BLD
    • Under Construction Elevation Certificate - BLD-PR
  • Construction Holds: go to the permit inspections tab and request appropriate PR inspections. Note that system enforces a priority order where incomplete “PR” inspections will prevent the next field inspections from being requested. Click here to watch the inspection video
  • Shop Drawings
    • Concrete Floor/Deck System Shop Drawings - BLD-PR
    • Floor/Roof Truss System Plans/Shop Drawings - BLD-PR
    • Second Floor or Higher Deck – BLD
    • Truss/Strapping - BLD
  • Building Final Holds: go to the permit inspections tab and request appropriate inspections. Click here to watch the inspection video
    • Fire Final – FIRE
    • Onsite Grading Final – ENG
    • Engineering Final – ENG
    • Site Plan Conditions - BLD
    • Building Final - BLD
  • Request CO/CC: go to the permit sub-records tab and apply.
    • Onsite Grading Final – ENG
    • Engineering Final – ENG
    • Landscape Final – BLD
    • Final Blower Door Test - BLD-PR
    • Final Carbon Monoxide Certificate - BLD-PR
    • Final Elevation Certificate - BLD-PR
    • Final Insulation Cert - BLD-PR
    • Final Survey - BLD-PR
    • Final Termite Treatment Report - BLD-PR